AtlantCare worker clearing construction debris into a disposal bin
Cleaning

Post Construction Cleaning

Debris out, fine dust gone, stickers and adhesive off the glass — a handover clean that survives an inspection walk.

What we do

Construction dust is not ordinary dust. It is drywall and silica, it settles into every track, vent and light fixture, and it keeps reappearing for days if the first clean was superficial. We work in the order the trade requires — debris out, rough clean, then a final detail clean once the last tradesperson has left.

  • Debris removal, bin loading and disposal
  • Rough clean once the trades are finished
  • Fine dust removal from ledges, tracks, vents and fixtures
  • Sticker, label and adhesive removal from glass, appliances and fittings
  • Paint and compound spot removal from floors and finishes
  • Final detail clean immediately before handover

How the project runs

1

Site Walk

We scope the space, the finish types and the handover date, then quote in writing.

2

Debris Removal

Off-cuts, packaging and waste cleared and disposed of so the space can be cleaned properly.

3

Rough Clean

Bulk dust removed from all surfaces, floors and fixtures once trades are complete.

4

Final Detail Clean

Glass, tracks, vents, fittings and floors detailed the day before handover.

What you get

  • A space that passes a client or landlord inspection walk
  • Fine dust removed from tracks and vents, not just wiped off the visible surfaces
  • Debris disposed of — no bins left for you to arrange
  • Timed around your handover date, including evenings and weekends

Other AtlantCare services

Get an estimate for your upcoming project

Tell us the square footage and your handover date — we’ll send a written cleaning quote.

Contact